Pam Golding is pleased to introduce a new Development in Tynwald on Inchcraig Road with good payment terms. On offer are 75 medium density residential subdivided stands , in a potential gated community, measuring 400 square metres on average. There is a prolific communal borehole that will provide a constant water supply to the stands. There are red soils which translate into lower construction costs.
There are 5 modern housing designs to choose from.
A deposit of 40% will be required and the balance payable in monthly instalments over 12 months.
The development is expected to reach compliance stage in 2024